The bathroom renovation process in Bundaberg

In short: A bathroom renovation runs from brief and quote to strip-out, rough-in, waterproofing, tiling and handover. In Queensland, the QBCC says work over $3,300 needs a written contract and home warranty cover, with deposits capped at 10% (under $20,000) or 5% ($20,000 or more).

A step-by-step guide with the official rules for your state or territory. It is not legal advice.

Last updated: 24 November 2026

Bathroom with a freestanding bath and timber floor
Stock photo used under a free licence. Not a photo of this service, a local renovator or a local job.

This guide explains a typical bathroom renovation and the official rules that apply in Bundaberg. It is not legal advice. Follow the links and ask the renovator to confirm what's needed for your home.

1. Brief and budget

Decide what you need: a full renovation, an ensuite, a walk-in shower instead of a bath, or an accessible bathroom. Set a budget with a contingency.

2. Design and quote

The renovator inspects the room, talks through the layout and fittings, and gives a written quote. Check it covers demolition, plumbing, electrical, waterproofing, tiling, fixtures, and rubbish removal.

3. Licences and contract

In Queensland, check that whoever contracts for the job holds a QBCC licence that covers the work, and that plumbing and electrical work is done by licensed trades. Removing or changing structural walls usually needs building approval from a certifier.

Source: QBCC, Domestic building contracts.

In Queensland, the QBCC says domestic building work over $3,300 needs a written contract, and the contractor must arrange Queensland Home Warranty Scheme cover. The deposit before work starts can be no more than 10% for contracts from $3,301 to $19,999, or 5% for contracts of $20,000 or more. Contracts over $3,300 also come with a cooling-off period (generally five business days). Check the contractor's QBCC licence before you sign.

Sources: QBCC, Domestic building contracts; QBCC, Deposits and progress payments; QBCC, Cooling-off period.

4. Strip-out and rough-in

The old bathroom is stripped back, and the plumber and electrician rough in new services. Homes built before about 1990 may contain asbestos, including in wall and floor sheeting in wet areas, which must be handled safely by people qualified to do it.

5. Waterproofing, tiling and fit-off

Waterproofing is applied and allowed to cure before tiling. Then fixtures, screens, the vanity and lighting are installed. See our waterproofing guide.

6. Handover

Inspect the finished bathroom, note any defects in writing, and keep the waterproofing, plumbing and electrical certificates and warranties.

Official pages checked 23 November 2026. Rules can change; check the linked sources before relying on this summary.